Recruitment, selection and readiness assessment of six local educational agencies and eighteen schools for school-based behavioral health performance management. Seven Exhibit A elements plus the Section VI.F diversity statement.

Due
September 16, 2026 · September 30, 2026
Status
Final
Components
7 + VI.F
Lead
Impacter Pathway · SCCOE · DBG

Compiled September 11, 2026 · Exhibit A Section VI, Deliverable 1, Contract PDF Page 7

06 · Readiness Findings

Findings And Lessons Learned From Readiness Assessment At All Eighteen Sites

Exhibit A requires: “Findings and lessons learned from technology, data systems, and implementation readiness assessments at all eighteen (18) selected school sites.” Exhibit A, page 5 ↗

Readiness assessment is complete at all eighteen sites, seven sections each, covering site identification, school profile, technology and data, privacy and agreements, behavioral health capacity, scheduling, and a readiness determination with conditions. The full assessments are in the Site Readiness Assessments record. This section states what they show in aggregate.

18 / 18
Sites Assessed Against The Common Instrument, All Seven Sections
18 / 18
Sites On A Modern Student Information System With Single Sign-On Live
0
Sites Where Technology Is The Binding Constraint

Findings

Technology Is Not The Constraint At A Single Site

All six LEAs run a modern student information system (Aeries at Milpitas and Lake Tahoe; PowerSchool at Mount Pleasant, Sunnyvale and San Diego; Q at Rio) with Clever single sign-on live and in active production use districtwide. Device coverage is 1:1 at every site where it has been confirmed, and no site reports a network constraint outside the May state testing window, which falls clear of the October administration.

That inverts an assumption the field commonly makes. Not one of the eighteen sites is held back by technology. The readiness questions that remain are about people and time.

Schedule, Not Hardware, Determines Whether An Administration Runs Cleanly

The single best predictor of a smooth administration is whether a site already holds a block of time it can give. Rio Vista Middle has a 34 minute advisory period for all 6th grade students and few scheduling questions if at all. Rio Del Sol, in the same district with the same infrastructure and better staffing, has a genuinely open scheduling problem because its inquiry-led project-based structure has no equivalent block. Milpitas High operates a compressed advisory period of roughly twelve to seventeen minutes, weekly.

Districts adopting this model should be asked about their bell schedule before they are asked about their devices.

Audio Hardware Is The One Recurring Hardware Question, And It Is About Concurrency

Spoken-response administration requires headphones with microphones. Every site has them, because every site administers state testing. The question at each is not whether they exist but how many can be in one room at one time, which determines whether a grade level administers in one sitting or across three. It is the detail most easily assumed rather than counted, so it is recorded as an explicit count at every site.

Consent Varies By District And By Grade, Never By Site

Rio runs informational notice with opt-out districtwide, on the district’s reasoning that a skills-based assessment is not a mental health survey. Robert Sanders requested paper forms alongside the platform, the only site in the cohort to do so, for a family base where a magic-link email is not the reliable route.

Impacter Pathway operates a family consent platform ↗ for the program at consent.impacterpathway.com. It carries each district’s own family notice in English and Spanish, issues a magic link to each family, records opt-outs against the roster, and gives the LEA a live count of where consent stands. Consent design therefore stays a local decision, made district by district on local reasoning, while the record of that decision stays consistent across the cohort and can be reported the same way everywhere.

Two consequences follow. First, consent design belongs at LEA level, not site level. Second, where active consent applies, the make-up plan has to cover late-returning permission slips and not only absence, a distinction that determines whether a screening is a census or a sample.

More Systematic Screening And More Developed Tier Routing Appeared Together

This is the cohort’s most consequential observation, and Mount Pleasant produced it by design of selection. The pattern is an association across three comparable sites rather than an established causal relationship, and BHPM creates an opportunity to test it longitudinally.

August Boeger runs Sown to Grow with full fidelity, plus a wellness-center check-in that triages walk-ins by need and severity, and its referral pathway is documented and live. Robert Sanders runs the same instrument in its second year with less consistency, and its tier structure is described as developing. Ida Jew Academy / Valle Vista runs no universal instrument, and its referral routing and tier structure are correspondingly less formed. That contrast is precisely why the district selected the three together.

Three schools, one district, one leadership team, one set of policies. The variable that tracks with tier maturity is not staffing, funding or demographics. It is whether the school has an instrument that surfaces need at population level.

Universal screening ↗ and more developed tier-routing practices appeared together across these three sites, rather than routing maturity preceding the instrument. BHPM creates an opportunity to test that relationship longitudinally as screening, routing and service response are implemented across the cohort.

Chronic Absenteeism Is The Binding Constraint On Reach At Some Sites

Robert Sanders Elementary reports chronic absenteeism around 28 percent, well above district and state averages. At that rate a two-day administration window does not produce a census regardless of how well the technology works. The administration design there uses a make-up window rather than a single make-up session: a standing slot plus a second sweep, with the community school coordinator flagging chronically absent students for individual pickup, since the absence list and her existing caseload overlap heavily.

Reach is a distinct readiness dimension from capacity, and it does not appear in any standard readiness instrument. It should.

A Two-Period Pilot Retired More Implementation Risk Than Any Other Preparation

Rio Vista Middle ran an Impacter Pathway pilot in March 2026 in two class periods. It is the only site in the eighteen where student login, device suitability and headphone-and-microphone availability are demonstrated rather than expected, the only one where the administration environment has been tested for privacy, and the only one whose team has run the instrument before. Its assessment carries the fewest conditions in the cohort and the lowest projected first-day support need.

For statewide scaling the lesson is direct: a two-period pilot at one site retires more implementation risk than any amount of documentation about the same site.

Split Staffing Is A Capacity Fact The Readiness Rating Does Not Capture

Several participating sites are served by a counselor who also serves another campus. One school counselor covers Robert Sanders and Ida Jew Academy / Valle Vista, 943 students across two campuses. Rio Lindo has one counselor for 405 students. Rancho Milpitas is covered from Milpitas High during a staffing transition. Every one of these sites is staffed, and every one scores Competent on engagement capacity.

What the rating does not show is that administration at each depends on one person being present on one day. That is a scheduling fact about how the cohort is staffed, not a judgment about any school, and the whole of the remedy is naming a second trained proctor at each site before the administration window opens.

Lessons Learned, Stated For Reuse

  • Ask about the bell schedule before the device inventory. Devices are solved statewide; time is not.
  • Count audio hardware by concurrency, not by existence. “We have headphones” and “we can run a grade level at once” are different answers.
  • Pilot one class period at one site before assessing eighteen. It converts expectations into findings faster than any assessment instrument.
  • Treat reach as a readiness dimension. Chronic absenteeism determines whether universal screening is universal.
  • Name a second proctor wherever a single person carries a site. This costs nothing at planning time and everything on the day.
  • Run consent design locally and record it centrally. Districts reach different and well-reasoned answers; one platform keeps the record comparable across all of them.
  • Do not assume a tier structure precedes screening. In this cohort more systematic screening and more developed routing appeared together, a relationship BHPM creates an opportunity to test longitudinally.

Readiness As The Implementation Baseline

The readiness assessment provides the implementation baseline for the next phase of BHPM. The common capacity-building approach addresses needs identified across the cohort, while individual readiness profiles inform where support begins and which capacities receive greater emphasis at each participating LEA and site.

Why This Matters

Technology is not the constraint at any site; schedule is. More systematic screening and more developed tier routing appeared together.